(1) activities the floor of the installation should be in the telecom room other decorate and the system installation is complete and the ground after cleaning.
(2) building ground should comply with the design requirements, and shall be clean, dry. Activities floor space as a static pressure box, the walls and ground were dustproof, not peeling and rut crack, and laid insulation layer
(3) the floor obscene insulation, heat preservation material should level off, dry, coat should make dust, the envelope processing.
(4) activities in the floor installation process "should adjust level, do surface smooth, joint flat.
(5) air conditioning equipment, power distribution cabinet, server rack and other equipment frame should be fixed on the ground, and between a floor connectionless or elastic contact, in order to avoid air conditioning equipment vibration transfer to the activities on the floor.
(6) activities in the floor of the ideal height between 46 ~ 6 LCM.
(7) field cutting floor, surrounding should be smooth, no burr, and according to the balance of the original product technical requirements for the corresponding treatment.
(8) activities in the process of floor laid should adjust level. Meet obstacles or irregular surface, should according to the actual size set complement and additional support unit.
(9) in the activities on the floor handling, installation equipment to deal with floor surface to take protective measures. Laying completed, completes the static.